A floor is the most expensive thing on site and the first thing damaged.
Boxes get dragged. Trestles get moved. Someone walks a bead of adhesive down a hallway at four in the afternoon. Almost every floor we hear about was damaged during the build, not after it, and almost always in the week nobody thought protection was still needed.
We keep the range narrow on purpose. Every product on the shelf has been chosen because it holds up for the length of a real program, comes off cleanly, and does not need a specialist to lay it. If something does not do that, we stop stocking it.